1. Site Work Complete site preparation and grading Ensure proper drainage (minimum 6" fall over the first 10') Removal and disposal of all excess soil, vegetation, and debris Final grading to be smooth, compacted, and suitable for landscaping or driveway transition 2. Trash Enclosure Pad Add rebar stubs for masonry wall. 3. Exterior Finish LP SmartSide panel or lap siding (or approved equivalent) Trim as specified Factory prefinished siding (color to be selected by the Village) 4. Utility Stub-Ins Electrical stub-in only (final electrical work to be completed by the Village) Water and sewer stub-ins: One (1) cold water supply line (¾" copper), (location provided by Village) One (1) floor drain connected to sewer (location provided by Village) One (1) utility sink rough-in and drain line (location provided by Village) Sewer tie-in located 10’ from the structure All plumbing to comply with 2014 IPC Final connections to be completed by Village plumber 5. General Requirements Contractor to obtain all required permits and schedule inspections Compliance with Prevailing Wage Requirements All work must meet applicable local and state building codes Site must be cleaned and free of debris upon project completion All labor and materials to carry a minimum 1-year warranty