A-1 Mobilization LS 1 35,000.00 $ 35,000.00 $ A-2 Bonds and Insurance LS 1 30,000.00 $ 30,000.00 $ A-3 Capital Improvement Project Sign EA 2 2,500.00 $ 5,000.00 $ A-4 Right-of-Way Preparation LS 1 26,500.00 $ 26,500.00 $ A-5 Unclassified Street Excavation CY 128 106.00 $ 13,568.00 $ A-6 Remove Existing Pavement SY 540 72.00 $ 38,880.00 $ A-7 Remove Existing Concrete (Curb & Gutter) LF 442 20.00 $ 8,840.00 $ A-8 Remove Existing Striping LS 1 4,500.00 $ 4,500.00 $ A-9 Remove Existing Brick Pavers and Reinforced Concrete Subgrade SY 94 110.00 $ 10,340.00 $ A-10 9" Reinforced Concrete Pavement SY 896 112.00 $ 100,352.00 $ A-11 12" Lime Stabilized Subgrade SY 896 16.50 $ 14,784.00 $ A-12 Hydrated Lime (54 lbs/sy) TON 24 172.00 $ 4,128.00 $ A-13 Asphalt Overlay Re-working SY 46 125.00 $ 5,750.00 $ A-14 4" Topsoil Import SY 551 30.00 $ 16,530.00 $ A-15 Solid Block Sodding SY 551 28.00 $ 15,428.00 $ A-16 Install Brick Pavers SY 66 325.00 $ 21,450.00 $ A-17 Traffic Control LS 1 14,000.00 $ 14,000.00 $ A-18 Striping and Signage LS 1 8,250.00 $ 8,250.00 $ A-19 Temporary Erosion, Sedimentation, and Water Pollution Prevention and Control LS 1 6,500.00 $ 6,500.00 $ A-20 Adjust / Modify Existing Irrigation System LS 1 13,000.00 $ 13,000.00