1. The contractor shall: • Replace corner fillet bracket, thru rods, hardware & waler boards (provided by CCPRC) at: o A003, A004, A005, A008, A013, A015, A017, A020, A022, A023, A024, A026, A029, A031 (Southeastern Docks) o B009, B011, B024, B025, B027, B029, B030, B031, B036 (Southeastern Docks) o C003, C004, C006, C007, C008, C010, C012, C013 (Southeastern Docks) o C018, C023, C025, C028, C030, C031, C036, C037 (Southeastern Docks) o D024, D025, D026, D035 (Bellingham Docks) • Replace pile guide bracket, thru rods, & hardware (provided by PRC) on Main Dock walkway at: o 1st piling at Main Dock & D Dock o 2nd piling at Main Dock & D Dock o 4th piling at Main Dock & C Dock o 1st piling at Main Dock & South Dock Gangway • Replace End Pile Guide Bracket, thru rods, hardware and waler boards (provided by CCPRC) at: o A002/A003, A004/A005, A010/A011, A016/A017, A024/A025, A026/A027, A032/A033 (Southeastern Docks) o B004/B005, B016/B017, B022/B023, B024/B025, B026/B027, BT001 (Southeastern Docks) o C005/C006, C007/C008, C012/C013 (Southeastern Docks)...