1. Furnish and install 6” framing, batt insulation, 5/8” gyp each one side, taped and finished SF 2. Furnish and install plywood backing .75” thick 4’x8’ sheet EA 3. Carpentry Labor Rate HR 4. Furnish and install 6” sound batt insulation SF 5. Furnish and install furring and gyp on one side taped and finished SF 6. Furnish and install drywall ceilings up to 10’ above finished floor SF 7. Prime and paint drywall ceilings up to 10’ above finished floor SF 8. Prime and paint drywall ceilings up to 10’ above finished floor SF 9. 12” soffits – framing and drywall. Tape/Finish/Paint included. LF 10. Furnish and install – new ACT including grid SF 11. Prep/paint drywall ceilings SF 12. Cleanouts EA 13. .5” copper distribution piping LF 14. .75” copper distribution piping LF 15. 1” copper distribution piping LF 16. Furnish and install new 8” round PVC coated duct LF 17. Furnish and install new 10” round PVC coated duct LF 18. Furnish and install new 12” round PVC coated duct LF 19. Furnish and install new 14” round PVC coated duct LF 20. Furnish and install new 16” round PVC coated duct LF 21. Furnish and install copper pipe insulation per bid docs LF 22. Mechanical labor rate HR 23. Furnish and install new LED can lights EA 24. Furnish and install new LED surface mounted fixture EA 25. Furnish and install new rigid conduit with main power feed LF