a. Full Depth Reclamation of existing asphalt concrete, asphalt base paving, cold milling, and pavement overlay with fiber reinforced asphalt concrete of various streets, as outlined on the Contract Plans; b. Street Improvements, including reconstruction and rehabilitation of existing hardscape improvements, new curb and gutter, and other various work items; and, c. Storm drain improvements. More specific work items included within the general category/type of work listed above include, but are not limited to: mobilization/demobilization; traffic control; community outreach; pavement removal; subgrade repairs; asphalt pavement repairs; cold-milling existing asphalt; asphalt overlay construction; removal and reconstruction of PCC driveways, sidewalk, cross gutters, local depressions, curb and gutter; removal and reconstruction of pedestrian ramps to meet current disabled access standards; construction of catch basins and curb drains; storm drain improvements; adjustments of existing utility appurtenances to new grade; removal and re-establishment of existing decorative hardscape improvements; landscaping and irrigation rehabilitation; signing and striping; implementation of Best Management Practices (BMP) for storm water pollution prevention during all construction activities; and other general improvements as outlined in the Contract Plans and Specifications for the above-stated project.