The work associated with Beach Drive Jetties Improvements Project includes the following estimated quantities: Base Bid · North Jetty Upper Half Precast Concrete Cap and South Jetty Joint Repair · Mobilization/Demobilization -1 LS · Erosion Control - 1 LS · Site Preparation and Demolition of 38 feet -1 LS · Pre-Cast Concrete Cap with Anchors/Dowels and Seals - 40 LF · Sand Fill- 80 CY · Traffic Control - 1 LS · South Jetty Joint Repair · Cast in Place Concrete Cap with Anchors and Seals -1 CY · Galvanized Steel Plate with Anchors - 11 SF Alternate 1 · North Jetty New Cast in Place Cap · Mobilization/Demobilization -1 LS · Erosion Control - 1 LS · Site Preparation and Demolition of 38 feet -1 LS · Cast In Place Concrete Cap, Reinforced - 23 CY · Sand Fill- 80 CY · Traffic Control - 1 LS · South Jetty Joint Repair · Cast in Place Concrete Cap with Anchors and Seals - 1 CY · Galvanized Steel Plate with Anchors - 11 SF Alternate 2 · North Jetty Surficial Concrete Repairs - 1 LS · Mobilization/Demobilization -1 LS · Erosion Control - 1 LS · Site Preparation and Demolition of 38 feet - 1 LS · Removal of Deteriorated Concrete and Clean Rebar-1 LS · Cast In Place Concrete, Reinforced, w/Anchors -10 CY · Sand Fill- 80 CY · Traffic Control - 1 LS · South Jetty Joint Repair · Cast in Place Concrete Cap with Anchors and Seals -1 CY · Galvanized Steel Plate with Anchors - 11 SF Alternate 3 · North Jetty CIPP Lining (Can be Added to Base Bid or to Alternates 1 or 2) · Mobilization/Demobilization - 1 LS · CIPP Lining - 48-lnch Diameter @ 65 LF Long · Traffic Control - 1 LS Alternate 4 · North Jetty Lining with GeoPolymer Mort ar Spray