This work shall consist of excavation and the removal of all existing materials to a grade necessary for new construction, furnishing and placing all necessary concrete as shown on the plans and grooming and seeding adjacent soils. 3.1.2 CONSTRUCTION METHODS: Class B concrete with a minimum 28-day compressive strength of 3,000 psi and a minimum 5-inches thickness shall be used for construction of the sidewalks and ramps. Construction shall be in accordance with the 2023 WVDOH Standard Specifications for Roads and Bridges, Section 609-Sidewalks, Public Right-of-Way Accessibility Guidelines (PROWAG) requirements and the attached details. Bedding shall consist of 5-inches of crushed limestone compacted to a dense and non-yielding condition, equivalent to approximately 95% of the maximum density as determined by the Standard Proctor Method...