The work to be completed in RFB #8498 includes all labor, equipment, materials, coordination activities, and incidentals. A. Detailed Design and Engineering 1. Concrete Slab Replacement a. Provide engineering services for concrete pad design 2. Rectifier Assessment and Design a. Analyze existing rectifier specification b. Ensure compatibility with site conditions c. Develop integration requirements 3. Utility Coordination a. Collaborate with local utility provider and power supply connections B. Site Preparation 1. Demolition Activities a. Remove existing damaged rectifier b. Dismantle protective cabinet c. Extract concrete slab 2. Site Readiness a. Prepare foundation area b. Establish proper grade and elevation c. Ensure site accessibility for new infrastructure C. Rectifier and System Implementation 1. Equipment Procurement a. Source new rectifier system b. Acquire electrical components c. Purchase protective cabinet matching original specification 2. Installation a. Mount protective panel/cabinet b. Install rectifier system c. Connect associated components d. Apply labeling D. Technical Requirements 1. Installation & Commissioning a. Develop implementation plan b. Establish logistics c. Create testing protocols d. System startup E. System Integration & Testing a. Perform functional verification b. Conduct component testing c. Document system performance