The DC Department of Transportation (DDOT) is seeking a qualified contractor to relocate the Movable Barrier System from TR Bridge to designated storage locations, provide maintenance services for the Barrier Transfer Machine and associate Concrete and Steel Barriers at a designated storage area by the CA. The selected contractor will be responsible for The preparation of Areas designated for storage of Barrier Transfer Machine and Barrier Systems relocating the Barrier Transfer Machine (BTM) and associated spare parts. relocating Concrete and steel barriers. Performing routine maintenance tasks of the Barrier Transfer Machine (BTM) as specified by the manufacturer and/or as per attached maintenance schedule (J.14 BTM Movable Barrier System Maintenance Schedule and J.15 Delaware Class BTM Operation and Maintenance Manual), to ensure the equipment remains in good working condition. Perform routine maintenance to concrete and steel barrier systems as specified by the manufacturer and/or as per attached maintenance schedule (J.14 BTM Movable Barrier System Maintenance Schedule), to ensure the equipment remains in good working condition. Preparing and maintaining the storage area in a clean and safe condition, free from debris, rodents, and other hazards. Moving back and re-installing Barrier Transfer Machine (BTM) and Associate Parts at Theodore Roosevelt Bridge Moving back and re-installing concrete and steel barrier systems at Theodore Roosevelt Bridge.