A INCIDENTAL WORK: MOB. DEMOB, BARRICADES, ETC. LUMP NA NA B 4/401: CONCRETE TOPPING SLAB REPAIR SQ. FT. 130 C 5/401: FULL DEPTH DOUBLE TEE SLAB REPAIR SQ. FT. 2200 D 7/401: VERTICAL SURFACE CONCRETE REPAIR SQ. FT. 25 E 8/401: OVERHEAD CONCRETE REPAIR SQ. FT. 45 F 9/402: INVERTED TEE BEAM CONCRETE REPAIR SQ. FT. 20 G 10/402: CONCRETE CURB REPAIR LIN. FT. 20 H 11/402: JOIST BOTTOM REPAIR LIN. FT. 20 I 24/703: PG1 PERIMETER WALL TOP GROUT REPAIR LOCATION 25 J 12/402: PG1 PERIMETER WALL TOP REPAIR LIN. FT. 100 K 17/403: SUPP. SHEAR CONNECTOR ANGLE CASE A LOCATION 10 L 18/703: SUPP. SHEAR CONNECTOR ANGLE CASE B LOCATION 8 M 19/403: DOUBLE TEE BEARING REINFORCING LOCATION 1 N 21/403: LANDING ANGLE REPLACEMENT LOCATION 10 O 2/501: RANDOM CRACK LIN. FT. 500 P 4/501: CONSTRUCTION JOINT SEALANT REPLACEMENT LIN. FT. 900 Q 8/601: PG1 MEMBRANE STRIP REPAIR SQ. FT. 4000 R HEAVY DUTY MEMBRANE WITH LEVELING INSTALLAION SQ. FT. 2750 S HEAVY DUTY MEMBRANE INSTALLATION SQ. FT. 550 T RESETTING OF PERIMETER RAILS ALLOWANCE NA NA $10,000