1. The Contractor shall be responsible for the collection, transportation, and disposal of solid waste generated at designated County facilities in accordance with all local, state, and federal laws. 2. The Contractor shall provide containers for the collection of solid waste materials generated at each designated County facility. 3. The Contractor shall coordinate site access directly with the appropriate authority at each location and follow customary check-in procedures upon arrival. 4. The Contractor shall collect solid waste on a regularly schedule basis determined by the County and agreed upon by the Contractor. In areas where pick-up schedule is less than five days per week, contractor must contact using department to determine best day and time for pick up. If requested, signed pick up tickets must be left with authorized personnel after each pick up.