1 MOBILIZATION / DEMOBILIZATION (MAX. 5%) 1 LS $ $ 2 MAINTENANCE OF TRAFFIC & PEDESTRIAN CONTROLS (MAX 5%); Includes Main Street detour and submittal of an FDOT Certified detour plan. 1 LS $ $ 3 INSURANCE (3%) 1 LS $ $ 4 PERFORMANCE & PAYMENT BONDS 1 LS $ $ 5 VIDEO-AUDIO EXISTING CONDITIONS 1 LS $ $ 6 2” CERTA-LOK YELOMINE IPS PVC BY OPEN CUT 150 LF $ $ 7 4" C-900 PVC DR-18 WATER MAIN BY OPEN CUT 50 LF $ $ 8 6" C-900 PVC DR-18 WATER MAIN BY OPEN CUT 800 LF $ $ 9 2” CERTA-LOK YELOMINE IPS PVC WATER MAIN BY HDD 1,850 LF $ $ 10 4” CERTA-LOK C-900/RJ PVC WATER MAIN BY HDD 550 LF $ $ 11 6” CERTA-LOK C-900/RJ PVC WATER MAIN BY HDD 4,550 LF $ $ 12 DUCTILE IRON FITTINGS 3.5 TONS $ $ 13 1” SINGLE SERVICE CONNECTION (LONG SIDE) 21 EA $ $ 14 1” DOUBLE SERVICE CONNECTION (LONG SIDE) 19 EA $ $ 15 2” SINGLE SERVICE CONNECTION (LONG SIDE) 1 EA $ $ 16 2” DOUBLE SERVICE CONNECTION (LONG SIDE) 1 EA $ $