1 * CLEARING AND GRUBBING ACRE 1.00 $___________ $_________________ 2 * TOPSOIL, ON-SITE CY 1489.00 $___________ $_________________ 3 * TOPSOIL, OFF-SITE CY 2295.00 $___________ $_________________ 4 * EXCAVATION, CLASS 10 CY 13702.90 $___________ $_________________ 5 * EXCAVATION, CLASS 10, IMPORT CY 12961.80 $___________ $_________________ 6 * EXCAVATION, CLASS 10, IMPORT - COMPACTED COHESIVE (CLAY) FILL ABOVE PLASTIC BARRIER, 6 INCHES CY 886.00 $___________ $_________________ 7 * EXCAVATION, CLASS 10, CHANNEL CY 2315.00 $___________ $_________________ 8 * SUBGRADE PREPARATION SY 13892.00 $___________ $_________________ 9 SUBBASE, MODIFIED, 6" SY 3856.00 $___________ $_________________ 10 SUBBASE, MODIFIED, VARIABLE THICKNESS CY 2552.00 $___________ $_________________