This project will replace an existing wood framed building housing electrical equipment serving the City’s effluent pump station at the Laguna Treatment Plant with a prefabricated metal building. The work includes existing building and selective site demolition, construction of a new concrete grade beam building foundation supported on drilled piers, procurement of a prefabricated metal building including engineering calculations and drawings, building fabrication and erection including building accessories, HVAC improvements, electrical improvements, re-support of existing overhead electrical conduits and cabinets currently supported by the existing building, site grading and surfacing replacement, and gate and fencing modifications. A majority of the existing electrical equipment will remain, and the pump station is required to remain operational throughout the duration of the project.