The base bid work under this contract includes the abatement, demolition, and disposal of an approximately 51,000 square feet three-story office building with two levels of parking, constructed of reinforced concrete and steel located at 99 Founders Plaza/20 Hartland Street in East Hartford, Connecticut. The building, including its foundation, frost-walls, footings, and any other sub-grade features shall be demolished in their entirety. The work includes but is not limited to site preparation, utility disconnection, specifically coordination with Eversource for electrical disconnections, with Connecticut Natural Gas (CNG) for gas disconnections, and with MDC for water and sewer disconnections, and site restoration/grading.