The selected qualified Contractor will be responsible for the construction of: • A five- to eight-foot-wide concrete sidewalk along the south side of Willow Run Boulevard from Harms Way to Clyde Morris Boulevard; Type F curb and gutter, detectable warnings, crosswalks, milling and resurfacing of affected crosswalks, a service driveway, and drainage. Drainage improvements include an inlet and a pipe culvert. The project limits on Willow Run Boulevard are from just west of Harms Way to Clyde Morris Boulevard for a total length of 1,298 feet. Total project length is 1,298 feet (0.24 miles). • Other construction elements include mobilization, maintenance of traffic, erosion control, clearing and grubbing, excavation, embankment, removal of existing concrete, pavement markings, signing, and sod.