The selected quali9ied Contractor will be responsible for the construction of: • Six‐foot‐wide sidewalk along the west side of Taylor Branch Road from State Route 421 (Dunlawton Avenue) to Taylor Road/Journey’s End Way. The total length is approximately 325 feet. The sidewalk will connect to the existing sidewalk in the southwest quadrant at the intersection of Dunlawton Avenue and terminates at the existing eight‐foot‐wide sidewalk/bicycle path east of Journey’s End Drive. • Six‐foot‐wide sidewalk along the north and south sides of Ravenwood Drive from west of Woodlake Drive to Clyde Morris Boulevard. The total length is approximately 360 feet. • Five‐foot‐wide sidewalk along the north and south sides of Woodlake Drive from 345 feet west of Clyde Morris Boulevard to Clyde Morris Boulevard. The sidewalk will connect to existing sidewalks on the north and south side of Woodlake Drive. • Five‐foot‐wide sidewalk along the south side of Herbert Street from west of Terrace Village Drive to east of City Center Drive. The total length is approximately 977 feet. The total project length is approximately 2,007 feet (0.38 miles). The project also includes curb and gutter, driveway aprons, detectable warning surfaces, demolition and removal of existing sidewalk, replacement of existing curb ramps that do not meet ADA compliance, installation of new ADA compliant curb ramps, and associated drainage modi9ications, pedestrian signals, signage, pavement markings and restoration.