A. Coordinate work with preparation for and installation of protective surfacing specified in Section 32 1816.13; install protective surfacing after playground equipment installation. B. Install in accordance with CPSC Pub. No. 325, ASTM F1487, manufacturer's instructions, and requirements of authorities having jurisdiction (AHJ). C. Anchor equipment securely below bottom elevation of resilient surfacing layer. D. Install without sharp points, edges or protrusions, entanglement hazards, pinch, crush, or shear points. E. Do not modify play events on site without written approval of manufacturer. F. Install required signage if not factory-installed. 3.04 FIELD QUALITY CONTROL A. Obtain the services of the equipment manufacturer's field representative to review the finished installation for compliance with specified requirements and with design criteria to the extent known to the Contractor; submit report of field review. B. Owner or Owner's representative will inspect playground equipment after installation to verify that playground meets specified design safety and accessibility requirements. C. Repair or replace rejected work until compliance is achieved.