The work shall consist of installing asphalt concrete Type A 3/8-inch Hot Mix Asphalt conforming to the Section 39 -2.02 of the Caltrans Standard Specifications dated to 2024. Use PG 70-10 binder in conformance with specifications. The contractor shall submit for approval to the City Engineer a Caltrans signed and verified Job Mix Formula (JMF) on Caltrans form CEM 3513, 15 days prior to the beginning of the work. This Hot Mix Asphalt shall not consist of any RAP material. Pavement preparation shall include the following preparation: Contractor shall spray all weeds in cracks with Monsanto brand Roundup, a minimum of 2 weeks prior to paving. All weeds shall be resprayed if rain occurs within 48 hours after application