C. The Project includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Contractor will be responsible for the removal of any existing equipment, control panels, conduits, accessories, materials, or any other existing equipment and any required surface preparation needed for a high-quality installation of the new equipment. Existing equipment to be removed by the Owner is listed in Section 1.5 – Work by Owner. Contractor shall coordinate with the Owner on all equipment removals. 2. Contractor to furnish and install three (3) Vertical Turbine Flocculator equipment packages into Flocculator Basin 3 at the Stickney WTP in accordance with specification 46 41 34 Vertical Turbine Flocculator Equipment.