The project is generally described as demolishing the entire existing one-story building, including its associated wood deck, fence, utilities, foundation, and gravel driveway. construct a new gravel parking area with a capacity for 21 vehicles, including one (1) ADA van-accessible concrete parking space and one (1) Electrical Vehicle Parking Space (EVPS) along with one (1) Level 1 Electrical Vehicle Charging Station. Construction of a gravel accessroad. Designate an area for an ADA-accessible portable toilet. Install two automatic electrical gates—one at the main site entrance (site 1) and the other at the site 2 entrance—along with their associated low voltage circuits from the power poles. Construct two stormwater management dry swales and install four-board fences along the property line adjacent to Raven road, according to plans and specifications.