Chelan Falls Park Bank Stabilization Work is approximately 400 feet of bank stabilization which includes, but is not limited to water care plan, spill control and prevention plan, temporary erosion and control plan, fish rescue and recovery plan, temporary construction access, temporary erosion and sedimentation control, field locate utilities, temporary construction signage, temporary steel plating, floating turbidity containment system fish seine with ecology blocks, construction fencing, tree protection fencing, straw wattle, site clearing and grubbing, staging area, earthwork and materials placement (geotextile fabric, boulders, cobble, crushed rock, sand and gravel), concrete steps, metal handrails, benches, woody material logs with chains and anchors, repair unmarked utilities, restoration of riparian areas (soil, mulch, seeding/sod, irrigation, riparian plantings), tree protection, quarry spalls, removal of temporary facilities, and site clean-up including temporary access roads and staging areas.