1. CONTRACTOR SHALL CONTACT DIGGER'S HOTLINE 5 WORKING DAYS PRIOR TO START OF DEMOLITION/CONSTRUCTION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING FOR AND LOCATING PRIVATE UTILITIES PRIOR TO THE START OF CONSTRUCTION. 3. COORDINATE SITE CONSTRUCTION ACCESS WITH OWNER PRIOR TO START OF CONSTRUCTION. 4. STRIP ONLY THE TOPSOIL WITHIN THE PROJECT LIMITS THAT WILL BE DISTURBED DURING CONSTRUCTION. 5. REMOVE ONLY THE EXISTING TREES AND VEGETATION WITHIN THE PROJECT LIMITS THAT INHIBIT CONSTRUCTION. 6. REMOVE ANY ABANDONED UTILITIES WITHIN THE PROJECT LIMITS THAT INHIBIT CONSTRUCTION. 7. PATCH EXISTING INLET AND MANHOLE STRUCTURES AS NEEDED. 8. ALL CONTRACTORS SUBMITTING A BID SHALL VISIT THE SITE AND REVIEW THE EXISTING CONDITIONS PRIOR TO THE BID DATE. ANY DISCREPANCIES FOUND ARE TO BE BROUGHT TO THE ATTENTION OF THE PROJECT ARCHITECT FOR REVIEW IMMEDIATELY UPON DISCOVERY. 9. ALL ITEMS TO BE REMOVED AND DISPOSED OF SHALL BE TAKEN FROM THE SITE AND DISPOSED OF IN A LEGAL MANNER. 10. VERIFY ALL REMOVAL AND SALVAGE ITEMS WITH THE OWNER. 11. ALL ITEMS TO BE SALVAGED SHALL BE DELIVERED TO THE OWNER. COORDINATE DELIVERY WITH OWNER. 12. ALL AREAS AND SITE FEATURES DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO THE ORIGINAL CONDITION. 13. INSTALLATION, MAINTENANCE, AND RESTORATION OF CONSTRUCTION SITE ACCESS SHALL BE INCLUDED IN BASE BID. 14. SITE ENTITIES OUTSIDE THE PROJECT LIMIT LINE SHALL NOT BE DISTURBED. 15. PROTECT AND AVOID ALL WETLAND AREAS. 16. ALL WORK IN THE PUBLIC RIGHT OF WAY REQUIRES SEPARATE PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS. 17. ALL SAWCUTS WITHIN THE PUBLIC RIGHT OF WAY SHALL BE FULL DEPTH. 18. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE PER CITY OF APPLETON STANDARD SPECIFICATIONS