1. lnstallation of erosion and sediment controls. 2. Tree and vegetation removal, 3. Grubbing of tree stumps and vegetation roots. 4. Removal of chain link fencing, gates, and bituminous concrete pavement. 5. Drainage structure and pipe construction. 6. Placement of base materials to achieve the playing court post-tensioned concrete slab and cast-in-place concrete hitting wall area slab subgrade elevations. 7. Fencing line, terminal, corner and gate post, and foundation construction. B. Playing court post-tensioned concrete slab construction. 9. Cast-in-place concrete hitting wall area slab construction. 10. Playing court post-tensioned concrete slab surfacing system installation. '11. Tennis court net post and net installation. 12. Chain link fencing and gate construction. 13. Topsoil placement, finished grading, and turf establishment.