1. This list is generic in nature for major items and intended only to give an overview of general project scope. 2. Building A @ 1200 sq feet Remove existing flooring and replace with LVT flooring Repair roof edge coping Install electrical feeder for HVAC Building A to electrical panel Building B Install security doors on front and rear entrances. Iron security doors will be considered instead of doors. Include hardware and frame. Replace all lighting with LED lighting. Add additional lights as needed. Verify all electrical outlets and switches are functional and relace with new receptacles and switches Install exterior lights with photocell operation. Lights shall have guards for night sky light reduction. 3. Building B @ 1,120 sq feet Remove exterior and replace with new Hardy plank siding and paint the building all exterior, including trim, soffits, and doors Remove garage door and personnel door and frame openings. Insulate wall. Match new exterior siding and sheetrock and finish interior wall Paint all interior walls. Furnish and install new LVT flooring Furnish and install new gym flooring. Replace all ceiling tiles. Replace all plumbing fixtures- sink, toilet and shower. Relocate and replace water heater in the restroom. Replace two windows with solid framed windows. Glass to be one way. Install security bars on windows. Replace exterior door with metal door, include hardware and frame. Replace all lighting with LED lighting. Add additional lights as needed. Verify all electrical outlets and switches are functional and relace with new receptacles and switches Install exterior lights with photocell operation. Lights shall have guards for night sky light reduction. Install lower kitchen cabinet with counter and with sink in breakroom