• Review existing documentation, including the 2019 Aquaculture Bioengineering Study of Massachusetts Freshwater Fish Culture Facilities by HDR, overseen by MassWildlife (see supporting documentation) • Identify gaps in the existing information to be further investigated to update existing condition assessments and define and prepare a project scope of work • Assess and evaluate overall site capacity (within reasonable downhill distance from water sources) and feasibility for development to accommodate various layout and phasing schemes. Site development must accommodate programmatic needs for interior facilities, site infrastructure and systems, as well as enclosed building facilities. • Develop conceptual design alternatives (including an evaluation of site redevelopment/layout, phasing to meet seasonal productions quotas determined by MassWildlife, available/adequate swing space(s), and sustainable building systems) • Develop preferred alternative(s) for final designs, budget, and schedule • Refine the preferred alternative to the Schematic Design level to meet programmatic needs, schedule, and budget • Prepare a Certifiable Study, based on the Schematic Design