The School Board of Broward County (SBBC) is accepting written proposals from qualified and experienced firms to provide planning, architectural and engineering services for a new system HVAC system for this school without an Ice Plant and Fan Coils: HV1 Charles Drew ES HVAC Improvements Presently there is an Ice Plant with two chillers and Fan coil system. The Designer is be asked to design a new highly efficient and cost-effective HVAC system for the whole school HVAC system the does not include: an Ice Plant and Fan Coil units. The Designer will be required to test and evaluate the existing HVAC systems in Buildings 1, 2, 3, 4, 5, 6 and 8 and present design options for a new school-wide HVAC system that does not utilize Fan Coil units or an Ice Plant and meet Broward County School Districts (District) design requirements (see Requirement). These options will be presented in the “Scope Valuation Report”, with construction cost estimates. The District will select the option design to move forward. The designs will address: