The Project consists of constructing a multi-use path (12' wide) from Palm Blvd. east along College Blvd., then turning south along Forest Rd. to Rocky Bayou Dr. The total project length is 2.5 miles. All work will be done within the existing right-of-way consisting of clearing, drainage improvements, earthwork, grading, asphalt paving, seeding and sodding, and other WORK as shown on the construction drawings and described in the specifications. Work shall be performed by contractors/subcontractors prequalified by the Florida Department of Transportation in: Drainage (7), Flexible Paving (10), Grading (11), Grassing, Seeding/Sodding (12), Guardrail (13), and Sidewalk (40). The work is further defined as shown on the Plans and as described by the Contract Documents.