The scope of work includes the planning, coordination, field sampling, quality assurance/quality control (QA/QC), data analysis, and reporting tasks necessary to ensure compliance with the requirements established in the Monitoring Plan. All tasks will be completed in accordance with the procedures and timelines detailed in the KIB Landfill Surface Water Monitoring Plan. This includes, but is not limited to: • Pre-sampling coordination and site preparation o Identifying laboratory accreditation o Bottle ordering o Verifying equipment type and calibration requirements o Coordinating with KIB staff for sampling dates • Collection of water samples at designated monitoring locations o Adherence to approved sampling methodologies and safety protocols o 3 surface water, 3 surface well, and 1 leachate location(s) o Appropriate duplicates and MS/MSD samples o Completing infield documentation (field forms/field notebook) • Proper handling, labeling, and shipment of samples to a certified laboratory • Preparation of Exceedance report. o Any exceedances of water quality standards shall be reported to ADEC by email within 14 days of receiving the analytical data from the laboratory. See Section SC 04 Documentation for additional timeline requirements. • Final report following the Alaska DEC Surface Water Monitoring Report Checklist document o Report will be submitted to ADEC within 90 days of the monitoring event and will include data from the initial and any resampling events electronically. See Section SC 04 Documentation for additional timeline requirements.