1. Provide and install work documented, detailed, and specified in Construction Documents. 2. This package includes interior and building demolition for all floor coverings, ceilings, floor slabs, wall coverings, walls, ceilings, and miscellaneous removals required by contract documents. Note that site demolition is in a separate bid package. 3. Provide labor, materials, and equipment for temporary bracing and shoring, as required for demolition. 4. Reference overall schedule provided in bid documents for the start, duration and completion dates for the work within this bid package. 5. Hollow metal frames in Masonry will be installed by Bid Package #7 Masonry Contractor. Hollow metal frames in Metal Stud Construction will be installed by Bid Package #12 Contractor. This contractor will unload and coordinate the storage and distribution of hollow metal frames. Provide installation of doors and hardware. 6. Aluminum hardware to be installed by Bid Package #11.