1 MOBILIZATION AND DEMOBILIZATION 1 LS $363,144.60 $363,145 01 57 13 2 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) 1 LS $184,888.29 $184,888 01 50 00 3 TEMPORARY TRAFFIC CONTROL 1 LS $11,782.96 $11,783 01 50 00 4 FIELD OFFICE 1 LS $24,355.43 $24,355 01 50 00 5 WATER CONTROL 1 LS $84,912.38 $84,912 31 10 00 6 CLEARING AND GRUBBING 5.8 AC $14,728.70 $85,426 02 42 00 8 CONCRETE PAD REMOVAL 830 SY $18.15 $15,063 02 42 00 9 TRASH REMOVAL 20 TN $648.16 $12,963 02 42 00 10 RIPRAP REMOVAL 196 TN $14.27 $2,799 35 43 20 11 TREE SALVAGE 35 EA $325.50 $11,392 02 42 00 12 CULVERT ABANDONMENT 1 LS $7,532.14 $7,532 31 23 00 13 COMMON EXCAVATION 30050 CY $45.37 $1,363,414 31 23 00 14 TRENCH SAFETY SYSTEM 1 LS $9,290.79 $9,291 31 23 00 15 STREAMBED SEDIMENT 915 TN $83.02 $75,989 31 23 00 16 STREAMBED COBBLES 395 TN $57.58 $22,768 31 23 00 17 STREAMBED SAND 64 TN $73.29 $4,707