1. Barricade off the working area. 2. Dispose of all construction materials. 3. Provide your own equipment for construction. 4. Concrete columns should be used for the foundation. 5. Post should be 8’ on center. 6. Hi-rib steel siding and roofing, minimum of .019 gauge 7. Wainscoting 32” up using Versetta Stone tight cut mission point with taupe wainscot cap. 8. 1’ overhangs on entire exterior, 6” fascia, 5” gutters with gutter guards, and 3” by 4” downspouts. 9. Walk doors • 1 A: Framed Opening - 6070 Glass Entry Door w/ 12" SideLite on L & R out-swing left hinge (right panel fixed) • 2 B: 3' x 6'8" 9 Lite Tempered Glass in Plain Flat Leaf Fibersteel Walk Door(s) outswing left hinge with panic hardware with lever handle, closer • 1 C: 3' x 6'8" Plain Flat Leaf Fibersteel Walk Door(s) out-swing left hinge with panic hardware with lever handle, closer 10. Windows • 3 D: 4'4" x 2'9" 6 Lite Pella Impervia Sliding Window(s) with low E glass with argon, foam insulation in frame • 3 E: 4'4" x 2'9" 6 Lite Pella Impervia Sliding Window(s) with low E glass with argon