Asbestos Abatement and Demolition The asbestos abatement portion of this contract shall apply to only the 901 Cannon Street. The contractor will be responsible for removal of all asbestos-containing material according to the asbestos survey report prepared for the project and in compliance with all EPA, OSHA, and SCHEC regulations, and any other applicable law, using best practices. 1. The contractor shall submit the required notifications to SCDHEC, and any other agency required to be notified. 2. The contractor shall furnish all labor, equipment, supervision, and incidentals necessary to provide complete asbestos abatement of the structure. 3. The contractor is responsible for all permits related to the project. 4. Should it be required to use a project monitor, the contractor shall provide the project monitor and all cost associated with the use of said project monitor. 5. Any additional cleaning required after the final cleaning will be performed at the expense of the contractor. 6. Any additional sampling costs shall be incurred by the contractor. 7. The contractor shall provide the final asbestos clearance inspection prior to conducting any demolition work. 8. Verify address and size of property, check the map, block and parcel numbers for size and shape of the parcel, review and inspect site prior to bidding. 9. Comply with all applicable laws, ordinances and codes of the federal, state and local governments and shall commit no trespass on any public or private property in performing any of the work as outlined. Obtain all required City, County, State, Federal and/or permits, clearances, inspections and licenses prior to work. 10. Provide the City a copy of permit prior to any work being performed. 11. The debris shall be hauled to an approved landfill as required by local codes and law. All dump fees/receipts for this demolition project shall be turned into the City along with invoices. 12. All work shall encompass all of the property and to the edge of the street and/or streets. 13. Remove all vegetation, downed trees, rubbish and/or debris from the property. 14. Neatly trim all mature trees, all limbs shall be cut, trimmed or removed so the lowest limb hanging shall be no less than 12 feet above the ground. All trees which measure up to and including 36 inches around at any point from ground level up to 48 inches above ground shall be removed. All trees removed, if cut shall be 6 inches below the finished ground level. 15. Completely demolish and remove the entire structure including all related and unrelated, attached and detached, surface and subsurface structural systems, materials, fixtures and utility systems, all pavement, concrete slabs, piers, foundations, poles, posts and all other improvements including all related and unrelated as described, all stumps, specified trees, shrubs and vegetation. Dust control shall be provided by contractor. 16. Completely remove all tanks, tires, septic systems, glass, metal, wood and all other debris. 17. The bid should include all necessary fill dirt to achieve even ground and positive grade. The lot shall have erosion control used where and as needed. The lot shall be seeded and straw over the seed to protect from erosion and burning. The lot shall be construction ready prior to invoicing. 18. Water/sewer utilities shall be located, marked and capped off (inspection required) 19. Site shall be disked, raked, seeded, and uniformly graded and with straw to provide proper surface drainage away from the surrounding properties, leaving all surfaces clear, clean and uniformly smooth, but never less than 1 inch above the top curb or street center line 20. Contractor shall employ standard practices in compliance with all applicable requirements Regarding excavation, trenching, backfilling, cleaning and leveling. All areas of soil disturbance, cuts and fills shall be properly prepared, and all back fills and imported fills shall be properly installed utilizing approved compaction methods as required 21. Locating, termination, removal and protection of utilities, services, curbs, gutters, sidewalks, streets, and roadways shall be the responsibility of the contractor. All damages shall be immediately repaired by the contractor, at the contractor’s expense. The contractor shall cap off the existing sewer service at the street right of way 22. Contractor shall notify utility provider to remove their respective service if required. Progress Energy, AT & T, Time Warner Cable, SC Electric & Gas