The work shall include all of the equipment and material necessary to perform this task in accordance with the requirements of the Glen Rock, New Jersey 07452 as needed and described in the bid documents. The work is located at the Main Treatment Facility and Southside Reservoir site, located at the end of De Boer Dr., in Glen Rock, NJ. The work generally consists of construction of a new PFAS treatment facility containing two (2) 8-foot diameter granular activated carbon (GAC) vessels, a stormwater detention system, new chemical feed systems, construction of a new pre-engineered metal building, a driveway extension and concrete walkway, and all electrical, instrumentation, process piping, mechanical, plumbing and site work shown on the contract documents.