Includes the construction of approximately 2,500 lineal feet of 10” PVC Includes relocation and/or adjustment to new grade of 5 existing utility markers, 11 existing fire hydrants, and adjust to new grade 27 existing valves due to FDOT's project 448796-1 US 192/US 441 from CR 532 to Arthur J Gallagher Blvd. Project consist of a road, drainage and sidewalk improvements that will extend for approximately 31,700 linear feet and is located along SR 500 (US 192) from the intersection with CR532 to the intersection with Arthur J. Gallagher Blvd. Proposed relocations under this project shall follow the construction activities and time line performed by FDOT as established on the utility work schedule included in the contract documents. All correspondence must be made through the Vendor Portal.