An evaluated pre-selection and pre-purchase of sludge dewatering equipment and appurtenances. The Work consists of, but is not limited to, selecting, designing, providing, starting-up and testing of two Sludge Dewatering Equipment (Centrifuge) systems, two Polymer Systems, two Polymer Tote Mixers, two Sludge Screw Conveyors, two Sludge Grinders, and two Rotary Lobe Pumps, including appurtenances, instrumentation; power panels; and control panels; to be installed by a General Contractor. The Work also consists of providing shop drawing submittals, providing operation and maintenance manual submittals and providing owner training. The Manufacturer selected and designed equipment system shall meet the specified performance requirements.