1. Specific mechanical installation of the one new Aerzen aeration blower (Model D256) in the current location of Blower #1 along with required aeration piping for air intake and for discharge to the aeration basins within Str. 30, service building. 2. Removal of existing aeration Blower #1 along with the necessary aeration piping to accommodate the installation of the one Aerzen aeration blower and piping identified in item 1 above. 3. Assuming an October 31, 2025, delivery of the Aerzen blower to the Edgerton WWTF, provide a schedule for starting and completing the installation work scope. 4. Reference list for similar aeration blower installations over the last five years. Reference list to include contact names and phone numbers for those familiar with the completed work scope. 5. Repair/sealing of penetrations for the removed blower air intake(s) for Blower #1.