1 TREE REMOVAL (6 TO 15 UNITS DIAMETER) EACH 115 2 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 779 3 PERIMETER EROSION BARRIER FOOT 40 4 INLET AND PIPE PROTECTION EACH 15 5 PORTLAND CEMENT CONCRETE BASE COURSE WIDENING 4" SQ YD 97 6 HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 TON 395 7 BITUMINOUS MATERIALS (TACK COAT) POUND 2115 8 PROTECTIVE COAT SQ YD 1180 9 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ FT 6298 10 DETECTABLE WARNING SQ FT 202 11 PAVEMENT REMOVAL SQ YD 215 12 HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" SQ YD 4602 13 TENT ANCHORS TO BE REMOVED EACH 86 14 COMBINATION CURB AND GUTTER REMOVAL FOOT 2533 15 SIDEWALK REMOVAL SQ FT 679 16 TEMPORARY SIDEWALK PAVEMENT REMOVAL SQ FT 5996 17 CLASS D PATCHES, SPECIAL 4" SQ YD 353 18 CLASS D PATCHES, SPECIAL 8" SQ YD 78 19 TEMPORARY DRIVEWAY RAMP EACH 6 20 TEMPORARY ADA RAMP EACH 3 21 PIPE HANDRAIL (SPECIAL) FOOT 47 22 CONCRETE CROSSWALK SQ FT 429 23 FIRE HYDRANT WITH AUXILIARY VALVE AND VALVE BOX EACH 2 24 STORM SEWER PIPE, PVC, SDR 26, ASTM D3034, 8" FOOT 29 25 STORM SEWER PIPE, PVC, SDR 26, ASTM D3034, 12" FOOT 80 26 ADJUST STRUCTURE EACH 10