The contractor will take title to the solid waste when it is loaded into the contractor’s truck. Title to solid waste collected hereunder will pass to the disposal facility or, as appropriate, other state approved disposal facility when such solid waste is delivered to the selected disposal site or state approved disposal facility. Title to and liability for any hazardous waste or unacceptable waste will always remain with the generator generating the unacceptable waste. The contractor shall furnish containers and a dump schedule. Containers are to be standard 8-yards, 6- yards and 4-Yards with sliding side doors. Slant and locking containers should be available upon request. Additionally, the Contractor shall furnish large roll-off units (20, 30, 40 cubic yards) on an as-needed basis to contain rubbish and construction waste. After dumping, each container shall be sprayed with deodorizer of sufficient strength to control container odors.