The contractor will provide all materials to repair the south two elevators in Telford Hall these materials will consist of but not be limited to the following to repair these elevators, so they function as required. 1. Machine and cable replacement on both elevators 2. Removal of old machines and cables 3. Installation of new machines, rope grippers, and cables 4. Adjust and program units 5. Pertest for proper operation 6. Schedule final test and inspections with state inspector 7. Any and all items required to make these functioning elevators 8. Includes all labor, materials, permits, freight, expenses, and 12 month warranty New Elevator Cab Interiors: 1. New Kingswood Walnut wall panels, with black inlay in between, over the existing side and back walls of the cab shell. 2. New #4 brushed stainless steel handrails on the side and back walls. 3. New 14 gauge #4 brushed stainless steel opening wall. b. New car and hall fixtures 1. New 11 gauge #4 brushed car operating panel with innovation PB23 bruiser, vandal resistant, metal pushbuttons w/ jewel, PB-1 key switches, digital position indicator, and locked fire service cabinet.