1 Mobilization 1 LS 2 Control of Work 1 LS 3 Construction Staking 1 LS 4 Control of Materials 1 LS 5 Progress Schedule 1 LS 6 Water Pollution Control 1 LS 7 Traffic Control 1 LS 8 Pedestrian Control Plan 1 LS 9 Clearing, Grubbing and Landscape Restoration 1 LS 10 Lead Compliance and Work Plan 1 LS 11 Potholing 1 LS 12 Install "Measure T" Sign (CityProvided) 7 EA 13 Changeable Message Board Signs 6 EA 14 Remove & Dispose Flatwork 35,200 SF 15 Remove & Dispose Curb & Gutter 10,975 LF 16 Remove & Dispose of Traffic Stripes, Pavement Markers & Pavement Markings 1 LS 17 Adjust Structure to Grade - SSMH 35 EA 18 Adjust Structure to Grade - SDMH 3 EA 19 Adjust Structure to Grade - Water Valve 60 EA 20 Adjust Structure to Grade - Water Meter Box 137 EA 21 Adjust Structure to Grade - Gas 3 EA 22 Remove & Dispose Catch Basin 4 EA 23 Remove & Dispose Storm Drain Pipe 60 LF 24 Remove Fence & Landscape Wall/Curb 1,390 LF 25 Cold Plane Asphalt Concrete 201,400 SF 26 HMA (2.5" Overlay) 5,162 TON 27 HMA (6" Plug) 3,620 TON 28 FDR (8") 57,390 SF 29 Curb & 12" Gutter (S1-A) 55 LF