• Before construction starts, prepare and submit for Engineer approval an Excavation and Water Management Plan and Stormwater Pollution Prevention Plan (SWPPP) describing means and methods to accomplish the Work. • Maintain site security, limit public access to project site, and conduct Work activities in a manner to not interfere with pedestrian or vehicle traffic on adjacent public rights-of-way. • Conduct a utility locate. • Install and maintain temporary erosion and sedimentation control (TESC) best management practices (BMPs) to prevent any off-site stormwater runoff or materials track-out and maintain them in full compliance with the approved SWPPP and applicable laws, regulations, and ordinances throughout construction. • Establish lined and bermed stockpile areas for contaminated soil and for inert (uncontaminated) debris and maintain appropriate BMPs for all stockpiles, including capture and treatment of runoff from the stockpile area, throughout the Work.