1. 159 L.S. 1 Maintenance and Protection of Traffic $ $ 2. 160 Allowance 1 Fuel Price Adjustment $ 5,900.00 $ 5,900.00 3. 160 Allowance 1 Asphalt Price Adjustment $ 11,600.00 $ 13,600.00 4. 201 L.S. 1 Clearing Site $ $ 5. 202 C.Y. 1,390 Excavation, Unclassified $ $ 6. 202 Unit 2 Excavation, Test Pits $ $ 7. 302 C.Y. 690 Dense-Graded Aggregate Base Course, Variable Thickness $ $ 8. 401 S.Y. 17,600 Milling, More than 3”, Less than 6” $ $ 9. 401 Ton 2,130 Hot Mix Asphalt Surface Course Mix I-5 $ $ 10. 401 Ton 2,660 Hot Mix Asphalt Base Course Mix I-2 $ $ 11. 601 L.F. 2,300 8” PVC Pipe, Sch. 40 $ $ 12. 601 Unit 35 Roof Leader and Drain Connection to 8” PVC Pipe $ $ 13. 601 L.F. 90 12” Reinforced Concrete Pipe, Class III $ $ 14. 601 L.F. 1,000 6” Underdrain $ $ 15. 602 Unit 2 Inlet, Type B $ $