GC License required Secure all necessary permits; maintain a clean and safe job site at all times. Submit construction schedules, product data, shop drawings, and warranties as required. Provide temporary utilities, protection, signage, and facilities during construction. Site improvements including erosion control, grading, underground utilities, etc. Furnish and install all cast-in-place concrete including slabs, footings, reinforcement, and forming. Pre-engineered metal building system – 177’x365’ – 5/12 roof slope, standing seam roof, gutters and downspouts. o No insulation in MB Package. Provide 1 ½ closed cell foam. Provide 4’-0” metal panels down each side and close the gables. o Field dimensions 177’-0” x 366’-0” from center of column to center of column. Install all equipment per plans and manufacturer specifications. Coordinate all work with other trades and maintain compliance with all applicable codes and standards. Include LED lights per Engineer Design. Permit with all local authorities. Design all foundations and furnish and install 3000 PSI concrete or what is required by the Structural Engineer. No Construction or Footings can interfere with the existing turf field or existing concrete apron on the turf field. Include $200,000.00 for contingency for rock. Include Civil Design if required. Columns shall be straight up to 10’-0” before taper. Provide protection column pads on all four sides of columns up to 10’-0” Include 45lbs of soil cement per square yard in turf area at required sub grade. Provide design/build for synthetic turf under covered facility.