The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutter, alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other itemsordetails,notmentioned above,that are required by the plans and standard specifications. The project locations will be on Alameda Street (East & West) – City Limit North to City Limit South; Walnut Street – Central Avenue to Acacia Court, Walnut Parkway – Cul De Sac to Cul De Sac; and Walnut Park Drive – Walnut Parkway to Walnut Street.