The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such otheritems or details, notmentioned above, that are required by the Plans and Standard Specifications. The project location will be Alameda West, Alameda East, Walnut Street, Walnut Park Way, and Walnut Park Drive.