Earth Excavation (241 CY), Trench Backfill (20 CY), Aggregate Base Course, Type A 12” (378 SY), Aggregate Base Course, Type B 4” (321 SY), Hot-Mix Asphalt Base Course, 10” (242 SY), Hot-Mix Asphalt Surface Course, IL-9.5, Mix “D”, N70 (140 Tons), Portland Cement Concrete Sidewalk 5” (2,889 SF), Pavement Removal (55 SY), Hot-Mix Asphalt Surface Removal, 2” (961 SY), Combination Curb and Gutter Removal (515 FT), Sidewalk Removal (1,650 SF), Storm Sewers, Class A, Type 1 12” (31 FT), Storm Sewer Removal, 8” (14 FT), Inlets, Type A (3 EA), Concrete Curb, Type B (97 FT), Combination Concrete Curb and Gutter, Type B-6.12 (493 FT), Underground Conduit, Galvanized Steel (439 FT), Handhole (2 EA), Double Handhole (1 EA), Electric Cable in Conduit (17,357 FT), Traffic Signal Post, 16’ (2 EA), Steel Mast Arm Assembly and Pole (3 EA), Concrete Foundation, Type A (12 FT), Concrete Foundation, Type C (4 FT), Concrete Foundation, Type E (37 FT), LED Signal Head, 1 Face, 3-Section (9 EA), LED Signal Head, 1 Face, 5- Section (4 EA), Pedestrian Signal Head, LED, Bracket Mounted, With Countdown Timer (4 EA), Inductive Loop Detector (7 EA), Detector Loop, Type 1 (563 FT), Remove Existing Traffic Signal Equipment (1 EA), Remove Existing Cable From Conduit (16,598 FT), Service Installation, Ground Mounted, Metered (1 EA), Pedestrian Signal Post, 10’ (1 EA), Full-Actuated Controller and Type Super P Cabinet (Special) (1 EA), Uninterruptable Power Supply (Special) (1 EA), Accessible Pedestrian Signals (4 EA), Optimize Traffic Signal System (1 EA).