The successful firm, individual or team shall provide the materials, equipment, and services for the following indoor walk-in coolers project which shall include decommissioning, removal and disposal of existing walk-in coolers (2), provision, shipping, and installation of two (2) new indoor walk-in coolers. The Contractor is also responsible for any permits and inspections. The site of the indoor walk-in coolers is located within the Lee Richardson Zoo in Garden City, Kansas. The Contractor shall have access to the site from both the north and the south via concrete or gravel access roads. Additional information regarding the site is available from Zoo staff. All zoo food items currently housed in the existing walk-in coolers will be relocated from the premises by the Zoo prior to work beginning. All work shall be warranted against all defects of material and/or application for a period of at least two (2) years from date of acceptance. Any failures that may occur within this warranty period due to defective installation and/or materials shall, upon written notification of such failure, be immediately repaired or replaced. HVAC Removal: Carefully disconnect and remove the existing HVAC unit(s) servicing the current walk-in coolers. Set units aside for reuse and protect them from damage during construction. Demo and Wall Removal: Remove the appropriate portion of the exterior wall of the Maintenance Shop building to provide access to the coolers. Set wall section aside for reuse and protect from damage during construction. Demo and dispose of existing walk-in cooler units (2) and associated debris. Cover opening as necessary to not leave building open to weather or pests. Site Preparation: Perform any necessary prep work following demo to ensure proper fit and installation of new coolers. Coordinate with site manager regarding floor leveling, drainage alignment, or other required adjustments. Cooler Installation: Install two new prefabricated floorless-style walk-in coolers (see specs p. 13) by sliding into place through the opening in the exterior wall of the building. Ensure units are properly aligned with the existing floor drain setup. Account for the likelihood that the new walk-in cooler entry doors will differ in size from the existing doors of the old coolers. Any resulting framing adjustments to the interior building wall must be completed to ensure a seamless and professional fit. Coolers to be installed directly on existing concrete slab with existing floor drain. Building Wall Reconstruction: Using previously removed section, reconstruct and finish the removed section of the Maintenance Shop exterior wall to its original condition or better. HVAC Reinstallation: Reinstall previously removed HVAC units to new coolers. Confirm proper function and connection of drainage and power. The Contractor will supply the labor, materials, indoor walk-in coolers (2), and incidentals necessary for the complete scope of work described. Contractor is also responsible for permits and inspections.