A. Installation of single ply retrofit roof system over existing low slope trapezoidal rib standing seam metal roof panels +/- 9,200 SF high gym roof. Roof system consists of TPO membrane (self-adhering), cover board, 1 ½” thick rigid insulation board and EPS flute fill insulation board. Mechanically attach to existing standing seam metal roof panels. B. Low roof lobby and locker rooms (+/- 5,200 SF) Removal of existing retrofit metal roof panel system constructed over original gravel surface bur with zonolite lightweight insulating fill over corrugated metal decking and bar joists. Install single-ply roofing system. Roof system consists of TPO membrane (selfadhering), coverboard and 1 ½” rigid insulation board mechanically attached to existing structural corrugated metal decking. Remove existing metal fascia panels and metal soffit panels; replace with new metal fascia and soffit panels. C. Install metal wall panels over existing exposed brick endwalls of high gym.