Work to be performed under this contract shall consist of HMA pavement surface removal, placing aggregate subbase and base course, placing a HMA binder course, placing a HMA surface course, miscellaneous gutter removal and replacement, and all other collateral work required to complete the work shown in the plans. 100 cu yd REM & DISP UNS MATL 200 ton AGG SUBGRADE IMPROVE 7,319 ton SUB GRAN MAT A 2,430 ton AGG BASE CSE A 11 ton AGGREGATE TEMP-ACCESS 29,586 pound BIT MATLS PR CT 3,851 BIT MATLS TACK CT 436 sq yd HMA SURF REM BUTT JT 18 sq yd TEMPORARY RAMP 1,942 ton HMA BC IL-9.5FG N70 1,253 ton HMA SC IL-9.5 C N70 5 ton INCIDENTAL HMA SURF 50 sq yd PCC DRIVEWAY PAVT 6 1380 sq yd HMA SURF REM 1 1/2 56 sq yd DRIVE PAVEMENT REM 1,696 foot COB CURB GUTTER REM 12 each INLETS ADJUST 1 each INLETS ADJ NEW T3F&G 2 each REMOV INLETS 1 l sum MOBILIZATION 20 each POTHOLING 554 sq yd HMA SURF REM VAR DP 12,546 sq yd PAVT REMOVAL SPL 1 each INLETS SPL N1 4 each SANITARY MANHOLE ADJ 1,696 foot CONC GUTTER SPL 1 l sum TRAF CONT & PROT SPL 1 l sum RESTORATION COMP 20 each DWNSPT ADJ